Skip to main
University-wide Navigation

000000 - Procurement and Contracting Requirements

  • 000000S01 Introduction and Preface
    12/2015
    All Projects
  • 002113 B01 Instructions to Bidders
    9/2021
    All Projects
  • 003126S01 Hazard Communication Information
    12/2015
    All Projects
  • 003126S02 Hazardous Materials Checklist
    12/2015
    All Projects
  • 003126S03 Asbestos Information for Consultants & Contractors
    12/2015
    All Projects
  • 003126S04 Lead Information for Consultants & Contractors
    12/2015
    All Projects
  • 003126S05 PCB Information for Consultants & Contractors
    12/2015
    All Projects
  • 003126S06 Spill Prevention Information for Consultants & Contractors
    12/2015
    All Projects
  • 003150S01 Room Numbering Standards
    12/2015
    All Projects
  • 003150S02 Floor Numbering & Room Numbering Checklist
    12/2015
    All Projects
  • 003150S03 Key Drawings and Space Data for University Buildings
    03/2016
    All Projects
  • 003150S03 Space Data Spreadsheet for Consultants
    04/2016
    All Projects
  • 003150S04 Renumbering Rooms
    12/2015
    All Projects
  • 003150S05 Building Efficiency Standard
    12/2015
    All Projects
  • 004100B01 Form of Proposal
    01/2022
    All Projects
  • 004539B01 DBE Participation Goals
    11/2020
    All Projects
  • 005000B01 Contract Agreement Form
    12/2015
    All Projects
  • 005000B02 Affidavit
    12/20/15
    All Projects
  • 005000B03 Determination of Responsibility, CPMD
    4/2021
    All Projects
  • 005000B04 Memorandum to Bid File
    12/2015
    All Projects
  • 00611313 Performance Bond CM at Risk
    12/2015
    All Projects
  • 00611313 Performance Bond GC
    12/2015
    All Projects
  • 00611316 Payment Bond CM at Risk
    12/2015
    All Projects
  • 00611316 Payment Bond GC
    12/2015
    All Projects
  • 006120B01 Bid Bond GC
    12/2015
    All Projects
  • 006120B02 Bid Bond CM at Risk
    12/2015
    All Projects
  • 006333S01 AMERESCO Baseline Adjustment Procedure
    04/2016
    All Projects
  • 006333S02 AMERESCO Scope of ECM's
    12/2015
    All Projects
  • 006333S03 AMERESCO ECM Final
    12/2015
    All Projects
  • 006333S04 UK ESCO Baseline Adjustment Form
    12/2015
    All Projects
  • 007100B02 Punch List Responsibility
    12/2015
    All Projects
  • 007100B03 Program Custodial Closet and Storage Space Design Criteria
    12/2015
    All Projects
  • 007100S01 Program Design Criteria
    12/2016
    Main Campus only
  • 007100S02 Consultant Contract Responsibilities
    12/2015
    All Projects
  • 007200B00 General Conditions, GC
    11/2020
    All Projects
  • 007200B01 General Conditions, CM Risk
    11/2020
    All Projects