Skip to main
University-wide Navigation

230000 - Heating, Ventilating and Air Conditioning (HVAC)

  • 230000 Noise Criteria for HVAC Systems
    12/2015
    All Projects
  • 230500 Common Work Results for HVAC, Refrigerant Management
    07/2020
    All Projects
  • 230500S01 Common Work Results for HVAC
    12/2015
    All Projects
  • 230500S02 Common Work Results for HVAC Mechanical Materials & Methods
    05/2017
    All Projects
  • 230516S01 HVAC Piping Expansion Joints
    5/2021
    All Projects
  • 230523S01 GENERAL-DUTY VALVES FOR HVAC PIPING Valve Classification Schedules
    12/2015
    All Projects
  • 230543D01 UNDERGROUND DUCTS & RACEWAYS - Construction Details Underground Conduit
    12/2015
    All Projects
  • 230553S01 - Identification for HVAC Piping and Equipment (Ameresco)
    12/2015
    All Projects
  • 230553S02 Identification for HVAC Piping and Equipment: AHU_EF Naming Convention
    12/2018
    All Projects
  • 230593S01 Testing, Adjusting and Balancing for HVAC
    12/2015
    All Projects
  • 230620S01 Schedules for HVAC Piping Systems
    9/2021
    All Projects
  • 230719S01 Piping Insulation, Interior
    12/2021
    All Projects
  • 230900S03 Instrumentation and Controls for HVAC, 12/2019
    12/2019
    All Projects
  • 230913S01 Healthcare Clinical Temperature Humidity Monitoring
    7/2021
    MedCen/Hosp only
  • 230923.14S01 Flow Metering
    11/2021
    All Projects
  • 230923S09 SEQUENCE OF OPERATION
    12/2015
    All Projects
  • 230923S61 VARIABLE AIR VOLUME (VAV) SYSTEM WITH RELIEF AIR RETURN FAN
    12/2015
    All Projects
  • 230923S62- VARIABLE AIR VOLUME (VAV) SYSTEM WITH TRACKING RETURN FAN
    12/2015
    All Projects
  • 230923S63 FAN COIL AND UNIT VENTILATORS WITH FMS CONTROL
    12/2015
    All Projects
  • 230923S64 HOT WATER CONVERTOR WITH FMS CONTROL
    12/2015
    All Projects
  • 230923S66 POOL MONITORING AND CONTROL WITH FMS INTERFACE
    12/2015
    All Projects
  • 232200D03 Steam & Condensate Piping & Pumps, Steam Collection Leg
    8/2020
    All Projects
  • 232200D05 STEAM & CONDENSATE PIPING & PUMPS Steam Coil Piping
    12/2015
    All Projects
  • 232200D06_STEAM CONDENSATE METER DETAIL
    07/2019
    All Projects
  • 232200S05_STEAM CONDENSATE METERS
    07/2019
    All Projects
  • 232216 - Steam Pressure Reducing Valves
    08/2024
    All Projects
  • 232500S01 HVAC Water Treatment - Water Systems Chemical Treating
    05/2019
    MedCen/Hosp only
  • 232514S01 Glycol Systems
    10/2017
    MedCen/Hosp only
  • 233000D01 HVAC AIR DISTRIBUTION Chilled Water Coil Piping
    12/2015
    All Projects
  • 233000D02 HVAC AIR DISTRIBUTION Hot Water Coil Piping
    12/2015
    All Projects
  • 233300S02 AIR DUCT ACCESSORIES
    05/2017
    All Projects
  • 233346S01 Flexible Duct
    2/2021
    Main Campus only
  • 233346S02 Poly Flexible Duct
    2/2021
    MedCen/Hosp only
  • 233600D01 Reheat Coil Piping Schemetic
    5/2022
    All Projects
  • 233600S01 Air Terminal Units
    5/2022
    All Projects
  • 233600S02 Reheat Valves
    2/2021
    All Projects
  • 233600S03 Terminal Device Coil Assembly
    07/2020
    Main Campus only
  • 233700S01 HVAC Air Outlet and Inlets
    12/2019
    All Projects
  • 233816 - Fume Hood Standard
    10/2024
    All Projects
  • 233816D01 FUME HOODS - EXHAUST DETAILS
    12/2015
    All Projects
  • 233816D02 Fume Hoods - Details
    12/2015
    All Projects
  • 233816D03 FUME HOODS - EXHAUST DETAILS
    12/2015
    All Projects
  • 233816D04 FUME HOODS - Ductwork Detail
    12/2015
    All Projects
  • 233816N01 - NOTES FOR DRAWING 233816D01
    12/2015
    MedCen/Hosp only
  • 234100S01 PARTICULATE AIR FILTRATION - Final Filter – Rigid Type
    12/2015
    MedCen/Hosp only
  • 234100S02 PARTICULATE AIR FILTRATION - Prefilters
    12/2015
    MedCen/Hosp only
  • 234100S03 AHU Filter Clips
    08/2018
    MedCen/Hosp only
  • 235200S01 HEATING BOILERS - Inspection Certificates
    12/2015
    All Projects
  • 236000D01 CENTRAL COOLING EQUIPMENT Secondary Pumping
    12/2015
    All Projects
  • 236000D02 CENTRAL COOLING EQUIPMENT – Building Pumping
    07/2019
    All Projects
  • 236000D03 CENTRAL COOLING EQUIPMENT – Chilled Water Meter Detail
    07/2019
    All Projects
  • 236000S01 CENTRAL COOLING EQUIPMENT - Secondary Chilled Water Pumping with Return Chilled Water Temperature Control for Campus Buildings (Ameresco)
    12/2015
    All Projects
  • 236000S02 BUILDING AND PLANT CHILLED WATER METERING
    07/2019
    All Projects
  • 236300D01 REFRIGERANT CONDENSERS - DETAIL
    12/2015
    All Projects
  • 236300D02 REFRIGERANT CONDENSERS - Notes
    12/2015
    All Projects
  • 238413S01 AHU Humidification Water Treatment - Monitoring
    7/2021
    MedCen/Hosp only