Reviewed: June 4, 2012Revised: October 10, 2024
Work orders are classified into the following groups, along with their response times and examples of each category:
EMERGENCY: Items that create an immediate danger to human life or University property. Examples include, but are not limited to, chemical spills, floods, major loss of a utility, medical gas alarms, and fire alarms.
Response time = within 10 minutesCompletion time = within 30 working days
URGENT: Items that have a direct effect on patient care or anything that represents a potential safety hazard to anyone. Examples of items in a patient room or patient care area that would fall into this category may include, but are not limited to, power issues (i.e., no power to outlets, breakers tripped), heating/cooling issues (i.e., any AHU/EF fans that are off, safety tripped or AHU Discharge Temperature/VAV Control alarms supplying any patient area or clinical area), secured doors not allowing access, lighting problems, and plumbing problems (i.e., clogged sinks/showers, leaky sinks/showers/toilets).
Response time = within 1 hourCompletion time = within 30 working days
HIGH PRIORITY: Items that affect the comfort and/or the operation of University staff and faculty (not patients). Examples may include, but are not limited to, offices, public spaces and/or corridor lighting, heating/cooling issues (i.e., any AHU Discharge Temperature alarms or VAV control alarms supplying any classroom/office areas), stained ceiling tiles, plumbing problems (i.e., clogged sinks, leaky sinks/toilets) in office areas, and any secured areas that have a 2nd entrance/exit.
Response time = within 24 hoursCompletion time = within 30 working days
GENERAL MAINTENANCE: Items that do not adversely affect the operation of the Medical Center. Examples may include, but are not limited to, items such as squeaky door hinges and leaky faucets, secured area schedule changes.
Response time = within 7 daysCompletion time = within 30 working days
ELECTIVE IMPROVEMENTS / ESTIMATES: Items such as additions or changes that are "elective" in nature. Examples may be the addition of new shelves or the installation of new electrical outlets.
Response time = within 3 daysCompletion time = within 30 working days
EVENTS: Items pertaining to the set-up and support of a scheduled event or activity. Examples may include, but are not limited to, ceremonies, sporting events, meetings, staff appreciation, luncheons, dinners, and picnics.
Response time = as scheduledCompletion time = as scheduled